<p>Prefabricated garden house, offices and gyms</p>
Garden houses

Prefabricated garden house, offices and gyms

We build garden offices, gyms, bath houses and small houses on a turnkey basis, with shrinkage allowance, and with frame technology. We work with Inexpensive standard projects to suit any budget and individual projects: any area, size, and planning.

We carry out all stages of work: from the procurement of raw materials and the production of materials to design and construction.

  • Working since 2002
  • Own vehicles for delivery
  • Excellent quality
  • Optimal construction terms
Many years of experience

Trusted Technologies of SIPs Houses Construction

How can you choose a company from the variety of offers on the building market? How not to pay the extra money and get a beautiful and attractive house? Apply to the company ETZ Group! Practical experience in the sphere of timber house construction exceeds 20 years. The staff consists of specialists of the highest quality, ranging from professional builders to experienced designers.

Quality control of construction and technology compliance is carried out at each stage, beginning from the foundation building.

Apart from standard garden houses and bathhouses, we also take orders on building brick houses and cottages on individual projects. We also make reconstruction and finish construction of almost existing buildings.

We take part in the whole cycle of work: design, delivery of materials, and all stages of construction. You don't have to do anything on your own.

Advantages

What Are the Advantages of Garden Houses?

Nowadays, there exist lots of architectural solutions and options for garden houses. What are the advantages of such buildings?

  • Relatively low construction cost.
    A prime cost of timber house construction is ultimately lower than of the brick house. Construction materials are always available, it’s possible to decide on the colour palette and type of wood. It’s unnecessary to prepare a building yard for timber house construction;
  • Cost-cutting on finishing materials.
    A brick house causes unavoidable interior decoration costs: plastering of walls, puttying, and hanging wallpapers. Timber houses don't require the appliance of such works. Natural structure and organic beauty turn out the best original decoration;
  • Low weight.
    Wood is lighter than concrete and brick, so the foundation can also be lightweight. Some projects are delivered to the homesite in the assembled condition, which significantly makes the construction process quicker;
  • Pleasant microclimate.
    Wooden walls are the natural room temperature and humidity regulator. It is always easy to breathe in the timber house, and the air is filled with pleasant aromas;
  • The tight deadline of the object construction.
    The terms and the tempo of construction to a greater degree depend on the whole house area and chosen materials. Sometimes, it is necessary to stop construction shrinkage. The process may be carried out without any technological interruptions for some constructions;
  • Long-term durability.
    A timber house will serve several decades with proper care and attention.
  • Experience in construction
  • Full range of services
  • Affordable prices
  • Newest technologies
  • Reliability
  • Personal approach
FAQ

Popular questions and answers

Stages of Construction of a SIP Garden House

Construction requires the following steps, most often:

  • 01
    The ready project is chosen from our catalogue
  • 02
    The material for the project is selected
  • 03
    The foundation is laid
  • 04
    The foundation of the house and the subfloor is being laid
  • 05
    The walls are installed
  • 06
    The strings are strengthened, an attic is constructed
  • 07
    The roof is covered
  • 09
    The interior is finished (It is usually required only for the construction of frame houses, it is not required in other types of wooden buildings)
  • 10
    The doors and windows are installed